File list

Jump to: navigation, search

This special page shows all uploaded files.

File list
 
Date Name Thumbnail Size Description Versions
19:44, 20 October 2020 ENI(20)000 122r3 New PoC Intelligent Transmission Network Optimization.cleaned.pdf (file) 509 KB PoC#12 Proposal 1
14:03, 24 September 2020 PDL PoC v2.pdf (file) 2.94 MB PoC#01 Status report at PDL#06 1
13:25, 21 September 2020 ENI(20)015 053 POC 8 Status Report.pdf (file) 2.58 MB PoC#08 status report at ENI#15 1
16:06, 16 September 2020 ENI(20)015 052 Progress reports of PoC 11 Intelligent Energy Management of DC.pdf (file) 2.55 MB Status report of PoC#11 at ENI#15 2
14:16, 16 September 2020 ENI(20)000093 POC 10 Status Report.pdf (file) 762 KB Status report of PoC#10 at ENI#15 1
14:03, 16 September 2020 PoC 6 Final Report.pdf (file) 1.39 MB PoC#6 Final Report at ENI#15 1
14:00, 16 September 2020 ENI(20)015 047 POC 9 Status Report.pdf (file) 1.16 MB PoC#09 Status report at ENI#15 1
13:36, 16 September 2020 ENI(20)000091r1 PoC 4 Final Report.pdf (file) 1.53 MB Final report of PoC#04 at ENI#15 1
13:32, 16 September 2020 ENI(20)000092r1 PoC 4 status and demo presentation.pdf (file) 1.09 MB Status report of PoC#04 at ENI#14 1
16:49, 9 July 2020 PDL(20)000 014r1 PoC - Decentralized Internet Infrastructure DII .pdf (file) 1.42 MB Revised after comments before deadline 1
16:32, 7 July 2020 ENI(20)014 046r1 PoC 7 Intelligent time synchronization of network final rep1.pdf (file) 1.33 MB PoC#07 final report at ENI#14 1
16:30, 7 July 2020 ENI(20)014 030 PoC 5 final report1.pdf (file) 1.57 MB PoC#05 final report at ENI#14 1
16:25, 7 July 2020 ENI(20)014 030 PoC 5 final report.pdf (file) 1.57 MB PoC#05 final report at ENI#14 2
17:17, 29 June 2020 ENI(20)013 025r9 Poc Proposal Intelligent Energy Management 0423 names revised.pdf (file) 1.17 MB revised names 1
18:48, 26 June 2020 PDL(20)000 014 PoC - Decentralized Internet Infrastructure DII .pdf (file) 1.42 MB PDL confcall#30 1
12:12, 26 June 2020 PoC.11 Interlligent Energy Management1.pdf (file) 1.17 MB Corrected Huawei contacts 2
17:55, 25 June 2020 ENI(20)014 024 Progress reports of PoC 11 Intelligent Energy Management.pdf (file) 2.23 MB PoC#11 report at ENI#14 1
17:48, 25 June 2020 ENI(20)014 061 PoC 9 - Status Report.pdf (file) 826 KB Status Report ay ENI#14 1
17:44, 25 June 2020 ENI(20)014 025r1 PoC 8 test plan of PoC Stage 3.pdf (file) 1.53 MB Status Report & Test Plan at ENI#14 1
16:46, 25 June 2020 ENI(20)014 046r1 PoC 7 Intelligent time synchronization of network final rep.pdf (file) 1.33 MB Final Report of PoC#07 at ENI#14 1
20:13, 24 June 2020 ENI(20)000077 PoC 10 status update.pdf (file) 613 KB PoC#10 status update at ENI#14 1
20:10, 24 June 2020 ENI(20)014 050 PoC 4 Status Report.pdf (file) 904 KB PoC#04 Status report at ENI#14 1
20:08, 24 June 2020 ENI(20)014 062 PoC 4 Status Presentation.pdf (file) 1.03 MB PoC#04 Status presentation at ENI#14 1
20:02, 24 June 2020 ENI(20)014 062 PoC 4 Status Presentation.pptx (file) 561 KB ENI#14 PoC#4 status report 1
20:31, 18 May 2020 Poc report template v2.1.1.docx (file) 18 KB Version 2 1
20:25, 18 May 2020 Poc proposal template v2.1.1.docx (file) 17 KB Version 2 1
14:10, 5 May 2020 Related list of H2020 research projects.pdf (file) 479 KB List of H2020 PDL related research projects 1
17:24, 24 April 2020 PoC.11 Interlligent Energy Management.pdf (file) 1.17 MB PoC#11 intelligent Energy management of DC 1
20:29, 20 March 2020 PoC Intelligent Telecom Network Energy Optimization.pdf (file) 1.95 MB PoC#10 Interim Report at ENI#13 1
20:27, 20 March 2020 PoC.9 Autonomous Network Slice Management for 5G.pdf (file) 751 KB PoC#9 Interim report at ENI#13 1
20:24, 20 March 2020 PoC.8 Intent-based user experience optimization at ENI13.pdf (file) 1.27 MB PoC#8 Interim Report at ENI#13 1
20:19, 20 March 2020 ENI(20)013 041 PoC 4 Report.pdf (file) 1.01 MB PoC#4 Interim Report at ENI#13 1
20:13, 20 March 2020 ENI(20)013 051 PoC 5 Report.pdf (file) 2.01 MB PoC#5 Interim Report at ENI#13 1
12:43, 13 November 2019 Report for PoC 1 Intelligent Network Slicing Life Cycle Management v1.pdf (file) 1.71 MB Final report of PoC1 Intelligent Network Slicing Life Cycle Management 1
19:22, 29 March 2019 ENI(19)000055 PoC proposal Predictive FM of E2E Network Slices.pdf (file) 1.89 MB PoC proposal description 1
17:47, 28 January 2019 ENI(18 000234r1 PoC Proposal on securing against Intruders and other threats.pdf (file) 925 KB correct file name 2
11:01, 13 November 2018 PoC-02 proposal.pdf (file) 1.04 MB Description of the "Elastic Network Slice Management" PoC This PoC is meant to showcase the network elasticity mechanisms proposed and developed by the European research project 5G-MoNArch, with a special attention to the AI/ML aspects. These procedur... 1