PoC Framework: Difference between revisions
Korycinska (talk | contribs) |
|||
(8 intermediate revisions by 3 users not shown) | |||
Line 4: | Line 4: | ||
The ENI Proof of Concept (PoC) Framework GS describes the full ISG ENI PoC activity process, roles, responsibilities, acceptance criteria, etc... | The ENI Proof of Concept (PoC) Framework GS describes the full ISG ENI PoC activity process, roles, responsibilities, acceptance criteria, etc... | ||
The latest version of this document can be downloaded here: | The latest version of this document can be downloaded here: [https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=57071#_blank GS 006 v2.1.1]. | ||
For convenience of the PoC Teams, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below. | For convenience of the PoC Teams, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below. | ||
Line 10: | Line 10: | ||
= Templates = | = Templates = | ||
[https://eniwiki.etsi.org/images/e/e5/Poc_proposal_template_v2.1.1.docx PoC Proposal Template] | |||
[https://eniwiki.etsi.org/images/d/dc/Poc_report_template_v2.1.1.docx Final Report template] | |||
= PoC Topics = | = PoC Topics = | ||
Line 19: | Line 18: | ||
= Submitting a PoC Proposal = | = Submitting a PoC Proposal = | ||
# The PoC Team fills in the PoC Proposal template | # The PoC Team fills in the PoC Proposal template. | ||
# The PoC Team uploads the completed proposal to the ETSI portal as a contribution to ENI | # The PoC Team uploads the completed proposal to the ETSI portal as a contribution to ENI. | ||
# The PoC Team sends an email to the | # The PoC Team sends an email to the PoC Review Team. | ||
# ENI PoC Review Team sends an e-mail containing the link to the proposal to the distribution list 'ISG_ENI@LIST.ETSI.ORG' with [ENI ISG PoC Proposal] in the subject line. | |||
= Acceptance Criteria = | = Acceptance Criteria = | ||
Line 41: | Line 41: | ||
= About ISG ENI = | = About ISG ENI = | ||
Within ISG ENI all PoC Proposals are presented and reviewed by the ISG; especially the PoC Review Team. | |||
==== PoC Review Team ==== | |||
The Volunteers for the PoC review team are: Huawei (Ray Forbes), Intel (Haining Wang), TIM (Luca Pesando), Redhat (Bill Wright), China Telecom (Yu Zeng), Portugal Telecom (Antonio Gamelas), ETSI CTI (Ultan Mulligan) & ETSI (Christine Mera). |
Latest revision as of 11:51, 10 March 2022
ENI PoC Framework Document
The ENI Proof of Concept (PoC) Framework GS describes the full ISG ENI PoC activity process, roles, responsibilities, acceptance criteria, etc...
The latest version of this document can be downloaded here: GS 006 v2.1.1.
For convenience of the PoC Teams, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.
Templates
PoC Proposal Template Final Report template
PoC Topics
PoC Projects are expected to be scoped arround PoC Topics identified and agreed by ISG ENI . See details and current list of PoC Topics.
Submitting a PoC Proposal
- The PoC Team fills in the PoC Proposal template.
- The PoC Team uploads the completed proposal to the ETSI portal as a contribution to ENI.
- The PoC Team sends an email to the PoC Review Team.
- ENI PoC Review Team sends an e-mail containing the link to the proposal to the distribution list 'ISG_ENI@LIST.ETSI.ORG' with [ENI ISG PoC Proposal] in the subject line.
Acceptance Criteria
The criteria for acceptance of ENI ISG PoC Proposals are:
- The ENI ISG PoC Proposal shall contain the information requested in the format of the ENI ISG PoC Proposal Template of clause A.1 GS ENI 006, referred to as the PoC Team. This will be checked by ETSI CTI and the PoC Review Team.
- The organizations participating in an PoC Team shall include at least two Manufacturers and at least one Network Operator or one Service Provider, where at least one Network Operator or one Service Provider shall be a member of the ENI ISG (refer to clause A.1.1 of GS ENI 006).
- The ENI ISG PoC Team proposal shall address at least one goal relevant to ENI i.e. related with an ENI Use Cases, an ENI Requirements or the suitability of an ENI System Architecture aspect (refer to clause A.1.3.1 of GS ENI 006).The output of the PoC should provide feedback to the ISG ENI that should support the improvement of the output of the existing WIs. Alignment with existing activities is required.
- The ENI ISG PoC Team proposal shall indicate the venue where the PoC will be demonstrated (e.g. PoC Team member lab, industry trade show, etc.) (refer to clause A.1.5 of GS ENI 006).
- A PoC Team project timeline shall be provided (refer to clause A.1.4 of GS ENI 006).
Any ENI ISG PoC Proposal which meets these required elements will be accepted.
CTI support
The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management.
ENI PoC Teams may request CTI assistance by contacting ETSI CTI.
About ISG ENI
Within ISG ENI all PoC Proposals are presented and reviewed by the ISG; especially the PoC Review Team.
PoC Review Team
The Volunteers for the PoC review team are: Huawei (Ray Forbes), Intel (Haining Wang), TIM (Luca Pesando), Redhat (Bill Wright), China Telecom (Yu Zeng), Portugal Telecom (Antonio Gamelas), ETSI CTI (Ultan Mulligan) & ETSI (Christine Mera).