ISG ENI Activities: Difference between revisions

From wiki
 
(37 intermediate revisions by 3 users not shown)
Line 5: Line 5:


ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions.  
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions.  
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.
ENI has Published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework.  
 
Recently published deliverables:
More information is available on the ETSI portal at: https://portal.etsi.org/tb.aspx?tbid=857&SubTB=857
Work Item details: ETSI Number: GR ENI 001
 
Work Item Title: Experiential Networked Intelligence (ENI); ENI use cases
ENI has published versions 3 of the Use cases and Requirements.
Target procedure or publication version: V1.1.1
 
For full details and schedule click here.
ENI has published versions 2 of the Proof of Concept (PoC) Framework and Terminology.  
Work Item details:
 
ETSI Number: GS ENI 002
ENI has published version 1 of the Context Aware Policy Management, System Architecture, Classification, evaluation, data mechanisms, AI mechanisms, Control loop Architectures and Functional concepts.
Work Item Title: Experiential Networked Intelligence (ENI); ENI requirements
 
Target procedure or publication version: V1.1.1
= Recently published deliverables =
For full details and schedule click here
 
Work Item details:
*''' ETSI GS ENI 001'''
ETSI Number: GR ENI 003
: Work Item Title: '''Experiential Networked Intelligence (ENI); ENI use cases'''
Work Item Title: Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis
: Target procedure or publication version: V3.1.1
Target procedure or publication version: V1.1.1
: For full details and schedule click [here] https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=58574#_blank
For full details and schedule click here.
 
Two more in Publication at the moment.
*'''ETSI GS ENI 002'''
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques. ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology.  
: Work Item Title: '''Experiential Networked Intelligence (ENI); ENI requirements'''
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework.  
: Target procedure or publication version: V3.1.1
ISG ENI has presently 33 Members /Participants.
: For full details and schedule click [here] https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=58575#_blank
 
*'''ETSI GR ENI 003'''
: Work Item Title: '''Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis'''
: Target procedure or publication version: V1.1.1
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52852#_blank
 
*'''ETSI GR ENI 004'''
: Work Item Title: '''Experiential Networked Intelligence (ENI); Terminology for Main Concepts in ENI'''
: Target procedure or publication version: V2.2.1
: For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=58904#_blank
 
*'''ETSI GS ENI 005'''
: Work Item Title: '''Experiential Networked Intelligence (ENI); System Architecture'''
: Target procedure or publication version: V1.1.1
: For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=54085#_blank
 
*'''ETSI GS ENI 006'''
: Work Item Title: '''Experiential Networked Intelligence (ENI); Proof of Concepts Framework'''
: Target procedure or publication version: V2.1.1
: For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=57071#_blank
 
*'''ETSI GR ENI 007'''
: Work Item Title: '''Experiential Networked Intelligence (ENI); Definition of Categories'''
: Target procedure or publication version: V1.1.1
: For full details and schedule click [here] https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=56393#_blank
 
*'''ETSI GR ENI 008'''
: Work Item Title: '''Experiential Networked Intelligence (ENI); Intent Aware Network Autonomicity'''
: Target procedure or publication version: V1.1.1
: For full details and schedule click [here] https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=58217#_blank
 
*'''ETSI GR ENI 009'''
: Work Item Title: '''Experiential Networked Intelligence (ENI); Processing of Data Mechanisms'''
: Target procedure or publication version: V1.1.1
: For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=58649#_blank
 
*'''ETSI GR ENI 010'''
: Work Item Title: '''Experiential Networked Intelligence (ENI); Evaluation of Categories'''
: Target procedure or publication version: V1.1.1
: For full details and schedule click [here] https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=58926#_blank
 
*'''ETSI GR ENI 016'''
: Work Item Title: '''Experiential Networked Intelligence (ENI); Functional Concepts'''
: Target procedure or publication version: V2.1.1
: For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=62588#_blank
 
*'''ETSI GR ENI 017'''
: Work Item Title: '''Experiential Networked Intelligence (ENI); Overview of Prominent Control Loop Architectures'''
: Target procedure or publication version: V2.1.1
: For full details and schedule click [here] https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=62589#_blank
 
*'''ETSI GR ENI 018'''
: Work Item Title: '''Experiential Networked Intelligence (ENI); Artificial Intelligence Mechanisms'''
: Target procedure or publication version: V2.1.1
: For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=62590#_blank
 
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques.
 
ENI has opened new work-items to collect version 4 of the Use cases and Requirements.  
 
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework (version 2).
 
= ENI whitepaper =
1st ISG ENI whitepaper is available [http://www.etsi.org/images/files/ETSIWhitePapers/etsi_wp22_ENI_FINAL.pdf here]
 
2nd ISG ENI whitepaper is available [https://www.etsi.org/images/files/ETSIWhitePapers/etsi-wp44_ENI_Vision.pdf here]
 
= ISG ENI presentation =
You may upload the ISG ENI presentation [https://portal.etsi.org/Portals/0/TBpages/ENI/Docs/ENI%2821%29018_004r5_ENI_goals_and_material_presentation.pdf here]
 
= ISG ENI high level summary =
You may upload the ISG ENI high level summary [https://portal.etsi.org/Portals/0/TBpages/ENI/Docs/Jan2021_ENI_high%20goals.pdf here]
 
= Members and participants =
 
The full list of ENI Members and participants is available [https://portal.etsi.org/TBSiteMap/ENI/ListOfENIMembers.aspx here]

Latest revision as of 16:54, 6 December 2021

About ISG ENI

ISG ENI - Industry Specification Group on Experiential Networked Intelligence

ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions.

ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry. ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.

More information is available on the ETSI portal at: https://portal.etsi.org/tb.aspx?tbid=857&SubTB=857

ENI has published versions 3 of the Use cases and Requirements.

ENI has published versions 2 of the Proof of Concept (PoC) Framework and Terminology.

ENI has published version 1 of the Context Aware Policy Management, System Architecture, Classification, evaluation, data mechanisms, AI mechanisms, Control loop Architectures and Functional concepts.

Recently published deliverables

  • ETSI GS ENI 001
Work Item Title: Experiential Networked Intelligence (ENI); ENI use cases
Target procedure or publication version: V3.1.1
For full details and schedule click [here] https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=58574#_blank
  • ETSI GS ENI 002
Work Item Title: Experiential Networked Intelligence (ENI); ENI requirements
Target procedure or publication version: V3.1.1
For full details and schedule click [here] https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=58575#_blank
  • ETSI GR ENI 003
Work Item Title: Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis
Target procedure or publication version: V1.1.1
For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52852#_blank
  • ETSI GR ENI 004
Work Item Title: Experiential Networked Intelligence (ENI); Terminology for Main Concepts in ENI
Target procedure or publication version: V2.2.1
For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=58904#_blank
  • ETSI GS ENI 005
Work Item Title: Experiential Networked Intelligence (ENI); System Architecture
Target procedure or publication version: V1.1.1
For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=54085#_blank
  • ETSI GS ENI 006
Work Item Title: Experiential Networked Intelligence (ENI); Proof of Concepts Framework
Target procedure or publication version: V2.1.1
For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=57071#_blank
  • ETSI GR ENI 007
Work Item Title: Experiential Networked Intelligence (ENI); Definition of Categories
Target procedure or publication version: V1.1.1
For full details and schedule click [here] https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=56393#_blank
  • ETSI GR ENI 008
Work Item Title: Experiential Networked Intelligence (ENI); Intent Aware Network Autonomicity
Target procedure or publication version: V1.1.1
For full details and schedule click [here] https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=58217#_blank
  • ETSI GR ENI 009
Work Item Title: Experiential Networked Intelligence (ENI); Processing of Data Mechanisms
Target procedure or publication version: V1.1.1
For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=58649#_blank
  • ETSI GR ENI 010
Work Item Title: Experiential Networked Intelligence (ENI); Evaluation of Categories
Target procedure or publication version: V1.1.1
For full details and schedule click [here] https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=58926#_blank
  • ETSI GR ENI 016
Work Item Title: Experiential Networked Intelligence (ENI); Functional Concepts
Target procedure or publication version: V2.1.1
For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=62588#_blank
  • ETSI GR ENI 017
Work Item Title: Experiential Networked Intelligence (ENI); Overview of Prominent Control Loop Architectures
Target procedure or publication version: V2.1.1
For full details and schedule click [here] https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=62589#_blank
  • ETSI GR ENI 018
Work Item Title: Experiential Networked Intelligence (ENI); Artificial Intelligence Mechanisms
Target procedure or publication version: V2.1.1
For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=62590#_blank

The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques.

ENI has opened new work-items to collect version 4 of the Use cases and Requirements.

Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework (version 2).

ENI whitepaper

1st ISG ENI whitepaper is available here

2nd ISG ENI whitepaper is available here

ISG ENI presentation

You may upload the ISG ENI presentation here

ISG ENI high level summary

You may upload the ISG ENI high level summary here

Members and participants

The full list of ENI Members and participants is available here