PoC Topics

From wiki
Revision as of 09:26, 15 May 2018 by Carignani (talk | contribs) (Created page with "= Rationale = ENI PoC Topics are specific areas, often linked to a Work Item, where input or feedback from the ENI Proofs of Concept is needed. ENI PoC Topics help to focus...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Rationale

ENI PoC Topics are specific areas, often linked to a Work Item, where input or feedback from the ENI Proofs of Concept is needed. ENI PoC Topics help to focus PoC Projects on the most relevant topics for the ISG ENI, and to increase the relevance of their contributions.

ENI PoC Topics are identified and documented by ISG ENI. ENI PoC Topics may include templates for the PoC Contributions and deadlines to ensure that the PoC Contributions arrive on-time to be taken into account by the targeted WIs.

ENI PoC Topics

As described in the ENI PoC Framework, a PoC Team proposal shall address at least one goal relevant to ENI i.e. related with an ENI Use Cases [2], an ENI Requirements [3] or the suitibilty of an ENI System Architecture [i.4] aspect(refer to clause A.1.3.1).The ouput of the PoC should provide feedback to the ISG ENI that should support the improvement of the output of the existing WIs. Alignment with exsting activities is required. See table below.

Level 1 Level 2
Use Case Network Operations Policy-driven IP managed networks
Radio coverage and capacity optimization
Intelligent software rollouts
Policy-based network slicing for IoT security
Intelligent fronthaul management and orchestration
Service Orchestration and Management Context aware VoLTE service experience optimization
Intelligent network slicing management
Intelligent carrier-managed SD-WAN
Network Assurance Network fault identification and prediction
Assurance of service requirements
Infrastructure Management Policy-driven IDC traffic steering
Handling of peak planned occurrences
Energy optimization using AI
Requirement Service and network requirements General requirements
Service orchestration and management
Network planning and deployment
Network optimization
Resilience and reliability
Security and privacy
Functional requirements Data Collection and Analysis
Policy Management
Data Learning
Interworking with Other Systems
Non-functional requirements Performance requirements
Operational requirements
Regulatory requirements
Non-functional policy requirements

Addressing a PoC Topic in a PoC Project

PoC Teams specify the targeted PoC Topic(s) in their PoC Proposal, and commit to provide the expected input or feedback in the requested format (template, if applicable) in a timely manner.

Feeding back the results

As soon as experimental results relevant for a given ENI PoC Topic are available (no need to wait for the PoC Project to be completed), the PoC Team creates a contribution and informs the ISG ENI by email (if the PoC Topic had a specific template for feedback contributions, it should be used). PoC Teams are also encouraged to contribute additional results and lessons learned during the PoC Project to the ISG ENI.