<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://eniwiki.etsi.org/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Korycinska</id>
	<title>wiki - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="https://eniwiki.etsi.org/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Korycinska"/>
	<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=Special:Contributions/Korycinska"/>
	<updated>2026-06-04T05:17:53Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.39.3</generator>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=PoC_Review_Team&amp;diff=141</id>
		<title>PoC Review Team</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=PoC_Review_Team&amp;diff=141"/>
		<updated>2020-02-10T15:36:28Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Members */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= Responsibilities=&lt;br /&gt;
ENI PoC Review Team it is an entity in charge of administering the ENI PoC activity process:&lt;br /&gt;
* maintaining and making available the PoC topics;&lt;br /&gt;
* reviewing PoC proposals and PoC reports against the acceptance criteria;&lt;br /&gt;
* declaring the acceptance/refusal of each PoC;&lt;br /&gt;
* notifying acceptance/refusal of each PoC in the ENI_POC@list.etsi.org&#039; mailing list;&lt;br /&gt;
* compiling the accepted PoC Proposals and Reports and making them available to the ENI ISG;&lt;br /&gt;
* monitoring the PoC project timelines, and sending the appropriate reminders to the PoC teams (for expected contributions, PoC report, etc.).&lt;br /&gt;
&lt;br /&gt;
= Members=&lt;br /&gt;
As agreed during the ENI#05 plenary meeting the following ENI delegates are part of the PoC Review Team:&lt;br /&gt;
* Luca Pesando, TIM,&lt;br /&gt;
* Mustafa Essa ,Vodafone, &lt;br /&gt;
* Raymond Forbes, Chairman, Huawei&lt;br /&gt;
* Sylwia Korycinska, Technical Officer, ETSI&lt;br /&gt;
* Michele Carignani, Technical Expert, ETSI&lt;br /&gt;
* Antonio Gamelas, PT&lt;br /&gt;
* Haining Wang, Intel Corporation (UK) &lt;br /&gt;
* Bill Wright, Red Hat Limited (agreed via ISG ENI mailing list on 26/04/2019)&lt;br /&gt;
* Yu Zeng, China Telecom (agreed via ISG ENI mailing list on 30/01/2020)&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=PoC_Review_Team&amp;diff=111</id>
		<title>PoC Review Team</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=PoC_Review_Team&amp;diff=111"/>
		<updated>2019-04-26T15:20:47Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Members */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= Responsibilities=&lt;br /&gt;
ENI PoC Review Team it is an entity in charge of administering the ENI PoC activity process:&lt;br /&gt;
* maintaining and making available the PoC topics;&lt;br /&gt;
* reviewing PoC proposals and PoC reports against the acceptance criteria;&lt;br /&gt;
* declaring the acceptance/refusal of each PoC;&lt;br /&gt;
* notifying acceptance/refusal of each PoC in the ENI_POC@list.etsi.org&#039; mailing list;&lt;br /&gt;
* compiling the accepted PoC Proposals and Reports and making them available to the ENI ISG;&lt;br /&gt;
* monitoring the PoC project timelines, and sending the appropriate reminders to the PoC teams (for expected contributions, PoC report, etc.).&lt;br /&gt;
&lt;br /&gt;
= Members=&lt;br /&gt;
As agreed during the ENI#05 plenary meeting the following ENI delegates are part of the PoC Review Team:&lt;br /&gt;
* Luca Pesando, TIM,&lt;br /&gt;
* Mustafa Essa ,Vodafone, &lt;br /&gt;
* Raymond Forbes, Chairman, Huawei&lt;br /&gt;
* Sylwia Korycinska, Technical Officer, ETSI&lt;br /&gt;
* Michele Carignani, Technical Expert, ETSI&lt;br /&gt;
* Antonio Gamelas, PT&lt;br /&gt;
* Haining Wang, China Telecom&lt;br /&gt;
* Bill Wright, Red Hat Limited (agreed via ISG ENI mailing list on 26/04/2019)&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=PoC_Review_Team&amp;diff=110</id>
		<title>PoC Review Team</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=PoC_Review_Team&amp;diff=110"/>
		<updated>2019-04-26T15:20:13Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Members */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= Responsibilities=&lt;br /&gt;
ENI PoC Review Team it is an entity in charge of administering the ENI PoC activity process:&lt;br /&gt;
* maintaining and making available the PoC topics;&lt;br /&gt;
* reviewing PoC proposals and PoC reports against the acceptance criteria;&lt;br /&gt;
* declaring the acceptance/refusal of each PoC;&lt;br /&gt;
* notifying acceptance/refusal of each PoC in the ENI_POC@list.etsi.org&#039; mailing list;&lt;br /&gt;
* compiling the accepted PoC Proposals and Reports and making them available to the ENI ISG;&lt;br /&gt;
* monitoring the PoC project timelines, and sending the appropriate reminders to the PoC teams (for expected contributions, PoC report, etc.).&lt;br /&gt;
&lt;br /&gt;
= Members=&lt;br /&gt;
As agreed during the ENI#05 plenary meeting the following ENI delegates are part of the PoC Review Team:&lt;br /&gt;
* Luca Pesando, TIM,&lt;br /&gt;
* Mustafa Essa ,Vodafone, &lt;br /&gt;
* Raymond Forbes, Chairman, Huawei&lt;br /&gt;
* Sylwia Korycinska, Technical Officer, ETSI&lt;br /&gt;
* Michele Carignani, Technical Expert, ETSI&lt;br /&gt;
* Antonio Gamelas, PT&lt;br /&gt;
* Haining Wang, China Telecom&lt;br /&gt;
* Bill Wright, Red Hat Limited&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=77</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=77"/>
		<updated>2018-10-16T14:23:04Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* ISG ENI high level summary */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
More information is available on the ETSI portal at: https://portal.etsi.org/tb.aspx?tbid=857&amp;amp;SubTB=857&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
= Recently published deliverables =&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039; ETSI GR ENI 001&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI use cases&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52850#_blank.&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GS ENI 002&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI requirements&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52851#_blank&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GR ENI 003&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52852#_blank&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GR ENI 004&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Terminology for Main Concepts in ENI&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=53598#_blank&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GS ENI 006&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Proof of Concepts Framework&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=54509#_blank&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques.&lt;br /&gt;
&lt;br /&gt;
ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
&lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework.&lt;br /&gt;
&lt;br /&gt;
= ENI whitepaper =&lt;br /&gt;
ISG ENI whitepaper is available [http://www.etsi.org/images/files/ETSIWhitePapers/etsi_wp22_ENI_FINAL.pdf here]&lt;br /&gt;
&lt;br /&gt;
= ISG ENI presentation =&lt;br /&gt;
You may upload the ISG ENI presentation [https://portal.etsi.org/Portals/0/TBpages/ENI/Docs/ETSI_ISG_ENI_Presentation_of_goals_and_material_rev9.pdf here]&lt;br /&gt;
&lt;br /&gt;
= ISG ENI high level summary =&lt;br /&gt;
You may upload the ISG ENI high level summary [https://portal.etsi.org/Portals/0/TBpages/ENI/Docs/ETSI_ISG_ENI_High_level_goals.pdf here]&lt;br /&gt;
&lt;br /&gt;
= Members and participants =&lt;br /&gt;
&lt;br /&gt;
The full list of ENI Members and participants is available [https://portal.etsi.org/TBSiteMap/ENI/ListOfENIMembers.aspx here]&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=76</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=76"/>
		<updated>2018-10-16T14:21:59Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* ISG ENI presentation */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
More information is available on the ETSI portal at: https://portal.etsi.org/tb.aspx?tbid=857&amp;amp;SubTB=857&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
= Recently published deliverables =&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039; ETSI GR ENI 001&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI use cases&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52850#_blank.&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GS ENI 002&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI requirements&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52851#_blank&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GR ENI 003&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52852#_blank&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GR ENI 004&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Terminology for Main Concepts in ENI&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=53598#_blank&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GS ENI 006&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Proof of Concepts Framework&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=54509#_blank&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques.&lt;br /&gt;
&lt;br /&gt;
ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
&lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework.&lt;br /&gt;
&lt;br /&gt;
= ENI whitepaper =&lt;br /&gt;
ISG ENI whitepaper is available [http://www.etsi.org/images/files/ETSIWhitePapers/etsi_wp22_ENI_FINAL.pdf here]&lt;br /&gt;
&lt;br /&gt;
= ISG ENI presentation =&lt;br /&gt;
You may upload the ISG ENI presentation [https://portal.etsi.org/Portals/0/TBpages/ENI/Docs/ETSI_ISG_ENI_Presentation_of_goals_and_material_rev9.pdf here]&lt;br /&gt;
&lt;br /&gt;
= ISG ENI high level summary =&lt;br /&gt;
You may upload the ISG ENI high level summary [here] https://portal.etsi.org/Portals/0/TBpages/ENI/Docs/ISG_ENI_high_level_notice.pdf&lt;br /&gt;
&lt;br /&gt;
= Members and participants =&lt;br /&gt;
&lt;br /&gt;
The full list of ENI Members and participants is available [https://portal.etsi.org/TBSiteMap/ENI/ListOfENIMembers.aspx here]&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=75</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=75"/>
		<updated>2018-10-16T14:21:15Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* ENI whitepaper */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
More information is available on the ETSI portal at: https://portal.etsi.org/tb.aspx?tbid=857&amp;amp;SubTB=857&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
= Recently published deliverables =&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039; ETSI GR ENI 001&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI use cases&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52850#_blank.&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GS ENI 002&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI requirements&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52851#_blank&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GR ENI 003&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52852#_blank&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GR ENI 004&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Terminology for Main Concepts in ENI&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=53598#_blank&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GS ENI 006&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Proof of Concepts Framework&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=54509#_blank&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques.&lt;br /&gt;
&lt;br /&gt;
ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
&lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework.&lt;br /&gt;
&lt;br /&gt;
= ENI whitepaper =&lt;br /&gt;
ISG ENI whitepaper is available [http://www.etsi.org/images/files/ETSIWhitePapers/etsi_wp22_ENI_FINAL.pdf here]&lt;br /&gt;
&lt;br /&gt;
= ISG ENI presentation =&lt;br /&gt;
You may upload the ISG ENI presentation [https://portal.etsi.org/Portals/0/TBpages/ENI/Docs/ETSI_ISG_ENI_Presentation_of_goals_and_material_rev9.pdf here] https://portal.etsi.org/Portals/0/TBpages/ENI/Docs/ETSI_ISG_ENI_rev7.pdf&lt;br /&gt;
&lt;br /&gt;
= ISG ENI high level summary =&lt;br /&gt;
You may upload the ISG ENI high level summary [here] https://portal.etsi.org/Portals/0/TBpages/ENI/Docs/ISG_ENI_high_level_notice.pdf&lt;br /&gt;
&lt;br /&gt;
= Members and participants =&lt;br /&gt;
&lt;br /&gt;
The full list of ENI Members and participants is available [https://portal.etsi.org/TBSiteMap/ENI/ListOfENIMembers.aspx here]&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=74</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=74"/>
		<updated>2018-10-16T14:20:34Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* ISG ENI presentation */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
More information is available on the ETSI portal at: https://portal.etsi.org/tb.aspx?tbid=857&amp;amp;SubTB=857&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
= Recently published deliverables =&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039; ETSI GR ENI 001&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI use cases&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52850#_blank.&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GS ENI 002&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI requirements&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52851#_blank&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GR ENI 003&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52852#_blank&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GR ENI 004&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Terminology for Main Concepts in ENI&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=53598#_blank&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GS ENI 006&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Proof of Concepts Framework&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://portal.etsi.org/webapp/workprogram/Report_WorkItem.asp?WKI_ID=54509#_blank&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques.&lt;br /&gt;
&lt;br /&gt;
ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
&lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework.&lt;br /&gt;
&lt;br /&gt;
= ENI whitepaper =&lt;br /&gt;
ISG ENI whitepaper is available [here] http://www.etsi.org/images/files/ETSIWhitePapers/etsi_wp22_ENI_FINAL.pdf&lt;br /&gt;
&lt;br /&gt;
= ISG ENI presentation =&lt;br /&gt;
You may upload the ISG ENI presentation [https://portal.etsi.org/Portals/0/TBpages/ENI/Docs/ETSI_ISG_ENI_Presentation_of_goals_and_material_rev9.pdf here] https://portal.etsi.org/Portals/0/TBpages/ENI/Docs/ETSI_ISG_ENI_rev7.pdf&lt;br /&gt;
&lt;br /&gt;
= ISG ENI high level summary =&lt;br /&gt;
You may upload the ISG ENI high level summary [here] https://portal.etsi.org/Portals/0/TBpages/ENI/Docs/ISG_ENI_high_level_notice.pdf&lt;br /&gt;
&lt;br /&gt;
= Members and participants =&lt;br /&gt;
&lt;br /&gt;
The full list of ENI Members and participants is available [https://portal.etsi.org/TBSiteMap/ENI/ListOfENIMembers.aspx here]&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=File:Introduction_of_ENI_PoC_project_-_Intelligent_Network_Slice_Lifecycle_Management.pdf&amp;diff=66</id>
		<title>File:Introduction of ENI PoC project - Intelligent Network Slice Lifecycle Management.pdf</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=File:Introduction_of_ENI_PoC_project_-_Intelligent_Network_Slice_Lifecycle_Management.pdf&amp;diff=66"/>
		<updated>2018-10-08T12:58:50Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=File:PoC-01_proposal.pdf&amp;diff=65</id>
		<title>File:PoC-01 proposal.pdf</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=File:PoC-01_proposal.pdf&amp;diff=65"/>
		<updated>2018-10-08T12:58:20Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=File:Interim_report_on_ENI_PoC_project_-1.pdf&amp;diff=64</id>
		<title>File:Interim report on ENI PoC project -1.pdf</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=File:Interim_report_on_ENI_PoC_project_-1.pdf&amp;diff=64"/>
		<updated>2018-10-08T12:57:17Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=PoC_Review_Team&amp;diff=62</id>
		<title>PoC Review Team</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=PoC_Review_Team&amp;diff=62"/>
		<updated>2018-10-08T08:47:46Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Members */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= Responsibilities=&lt;br /&gt;
ENI PoC Review Team it is an entity in charge of administering the ENI PoC activity process:&lt;br /&gt;
* maintaining and making available the PoC topics;&lt;br /&gt;
* reviewing PoC proposals and PoC reports against the acceptance criteria;&lt;br /&gt;
* declaring the acceptance/refusal of each PoC;&lt;br /&gt;
* notifying acceptance/refusal of each PoC in the ENI_POC@list.etsi.org&#039; mailing list;&lt;br /&gt;
* compiling the accepted PoC Proposals and Reports and making them available to the ENI ISG;&lt;br /&gt;
* monitoring the PoC project timelines, and sending the appropriate reminders to the PoC teams (for expected contributions, PoC report, etc.).&lt;br /&gt;
&lt;br /&gt;
= Members=&lt;br /&gt;
As agreed during the ENI#05 plenary meeting the following ENI delegates are part of the PoC Review Team:&lt;br /&gt;
* Luca Pesando, TIM,&lt;br /&gt;
* Mustafa Essa ,Vodafone, &lt;br /&gt;
* Raymond Forbes, Chairman, Huawei&lt;br /&gt;
* Sylwia Korycinska, Technical Officer, ETSI&lt;br /&gt;
* Michele Carignani, Technical Expert, ETSI&lt;br /&gt;
* Antonio Gamelas, PT&lt;br /&gt;
* Haining Wang, China Telecom&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=PoC_Review_Team&amp;diff=50</id>
		<title>PoC Review Team</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=PoC_Review_Team&amp;diff=50"/>
		<updated>2018-05-23T15:58:56Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Members */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= Responsibilities=&lt;br /&gt;
ENI PoC Review Team it is an entity in charge of administering the ENI PoC activity process:&lt;br /&gt;
* maintaining and making available the PoC topics;&lt;br /&gt;
* reviewing PoC proposals and PoC reports against the acceptance criteria;&lt;br /&gt;
* declaring the acceptance/refusal of each PoC;&lt;br /&gt;
* notifying acceptance/refusal of each PoC in the ENI_POC@list.etsi.org&#039; mailing list;&lt;br /&gt;
* compiling the accepted PoC Proposals and Reports and making them available to the ENI ISG;&lt;br /&gt;
* monitoring the PoC project timelines, and sending the appropriate reminders to the PoC teams (for expected contributions, PoC report, etc.).&lt;br /&gt;
&lt;br /&gt;
= Members=&lt;br /&gt;
As agreed during the ENI#05 plenary meeting the following ENI delegates are part of the PoC Review Team:&lt;br /&gt;
* Luca Pesando, TIM,&lt;br /&gt;
* Mustafa Essa ,Vodafone, &lt;br /&gt;
* Raymond Forbes, Chairman, Huawei&lt;br /&gt;
* Sylwia Korycinska, Technical Officer, ETSI&lt;br /&gt;
* Michele Carignani, Technical Expert, ETSI&lt;br /&gt;
* Antonio Gamelas, PT&lt;br /&gt;
* Yu Zeng, China Telecom&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=PoC_Review_Team&amp;diff=49</id>
		<title>PoC Review Team</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=PoC_Review_Team&amp;diff=49"/>
		<updated>2018-05-23T15:58:25Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Responsibilities */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= Responsibilities=&lt;br /&gt;
ENI PoC Review Team it is an entity in charge of administering the ENI PoC activity process:&lt;br /&gt;
* maintaining and making available the PoC topics;&lt;br /&gt;
* reviewing PoC proposals and PoC reports against the acceptance criteria;&lt;br /&gt;
* declaring the acceptance/refusal of each PoC;&lt;br /&gt;
* notifying acceptance/refusal of each PoC in the ENI_POC@list.etsi.org&#039; mailing list;&lt;br /&gt;
* compiling the accepted PoC Proposals and Reports and making them available to the ENI ISG;&lt;br /&gt;
* monitoring the PoC project timelines, and sending the appropriate reminders to the PoC teams (for expected contributions, PoC report, etc.).&lt;br /&gt;
&lt;br /&gt;
= Members=&lt;br /&gt;
As agreed during the ENI#05 plenary meeting the following persons are part of the PoC Review Team:&lt;br /&gt;
* Luca Pesando, TIM,&lt;br /&gt;
* Mustafa Essa ,Vodafone, &lt;br /&gt;
* Raymond Forbes, Chairman, Huawei&lt;br /&gt;
* Sylwia Korycinska, Technical Officer, ETSI&lt;br /&gt;
* Michele Carignani, Technical Expert, ETSI&lt;br /&gt;
* Antonio Gamelas, PT&lt;br /&gt;
* Yu Zeng, China Telecom&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=PoC_Review_Team&amp;diff=48</id>
		<title>PoC Review Team</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=PoC_Review_Team&amp;diff=48"/>
		<updated>2018-05-23T15:57:48Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= Responsibilities=&lt;br /&gt;
ENI PoC Review Team it is an entity in charge of administering the ENI PoC activity process. It is in charge of:&lt;br /&gt;
* maintaining and making available the PoC topics;&lt;br /&gt;
* reviewing PoC proposals and PoC reports against the acceptance criteria;&lt;br /&gt;
* declaring the acceptance/refusal of each PoC;&lt;br /&gt;
* notifying acceptance/refusal of each PoC in the ENI_POC@list.etsi.org&#039; mailing list;&lt;br /&gt;
* compiling the accepted PoC Proposals and Reports and making them available to the ENI ISG;&lt;br /&gt;
* monitoring the PoC project timelines, and sending the appropriate reminders to the PoC teams (for expected contributions, PoC report, etc.).&lt;br /&gt;
&lt;br /&gt;
= Members=&lt;br /&gt;
As agreed during the ENI#05 plenary meeting the following persons are part of the PoC Review Team:&lt;br /&gt;
* Luca Pesando, TIM,&lt;br /&gt;
* Mustafa Essa ,Vodafone, &lt;br /&gt;
* Raymond Forbes, Chairman, Huawei&lt;br /&gt;
* Sylwia Korycinska, Technical Officer, ETSI&lt;br /&gt;
* Michele Carignani, Technical Expert, ETSI&lt;br /&gt;
* Antonio Gamelas, PT&lt;br /&gt;
* Yu Zeng, China Telecom&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=47</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=47"/>
		<updated>2018-05-23T15:43:31Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
More information is available on the ETSI portal at: https://portal.etsi.org/tb.aspx?tbid=857&amp;amp;SubTB=857&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
= Recently published deliverables =&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039; ETSI GR ENI 001&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI use cases&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here]https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52850#_blank.&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GS ENI 002&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI requirements&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52851#_blank&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GR ENI 003&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52852#_blank&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques.&lt;br /&gt;
&lt;br /&gt;
ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
&lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework.&lt;br /&gt;
&lt;br /&gt;
= ENI whitepaper =&lt;br /&gt;
ISG ENI whitepaper is available [here] http://www.etsi.org/images/files/ETSIWhitePapers/etsi_wp22_ENI_FINAL.pdf&lt;br /&gt;
&lt;br /&gt;
= ISG ENI presentation =&lt;br /&gt;
You may upload the ISG ENI presentation [here] https://portal.etsi.org/Portals/0/TBpages/ENI/Docs/ETSI%20ISG%20ENI_presentation_March_2018%20.pdf&lt;br /&gt;
&lt;br /&gt;
= Members and participants =&lt;br /&gt;
&lt;br /&gt;
The full list of ENI Members and participants is available [here] https://portal.etsi.org/TBSiteMap/ENI/ListOfENIMembers.aspx&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=46</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=46"/>
		<updated>2018-05-23T15:41:07Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
More information is available on the ETSI portal at: https://portal.etsi.org/tb.aspx?tbid=857&amp;amp;SubTB=857&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
= Recently published deliverables =&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039; ETSI GR ENI 001&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI use cases&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here]https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52850#_blank.&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GS ENI 002&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI requirements&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52851#_blank&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GR ENI 003&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52852#_blank&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques.&lt;br /&gt;
&lt;br /&gt;
ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
&lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework.&lt;br /&gt;
&lt;br /&gt;
= ISG ENI whitepaper =&lt;br /&gt;
ISG ENI whitepaper is available [here] http://www.etsi.org/images/files/ETSIWhitePapers/etsi_wp22_ENI_FINAL.pdf&lt;br /&gt;
&lt;br /&gt;
= ISG ENI presentation =&lt;br /&gt;
You may upload the ISG ENI presentation [here] https://portal.etsi.org/Portals/0/TBpages/ENI/Docs/ETSI%20ISG%20ENI_presentation_March_2018%20.pdf&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
= ISG ENI members and participants =&lt;br /&gt;
&lt;br /&gt;
The full list of ENI Members and participants is available [here] https://portal.etsi.org/TBSiteMap/ENI/ListOfENIMembers.aspx&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=Main_Page&amp;diff=45</id>
		<title>Main Page</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=Main_Page&amp;diff=45"/>
		<updated>2018-05-23T15:32:23Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&amp;lt;center&amp;gt;&lt;br /&gt;
&amp;lt;h1&amp;gt;Welcome to ISG ENI Wiki&amp;lt;/h1&amp;gt;&lt;br /&gt;
&amp;lt;/center&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;span style=&amp;quot;font-size:14pt&amp;quot;&amp;gt;&lt;br /&gt;
&#039;&#039;&#039;About ISG ENI:&#039;&#039;&#039;&lt;br /&gt;
&amp;lt;/span&amp;gt;&lt;br /&gt;
* &#039;&#039;&#039;[[ISG ENI Activities]]&#039;&#039;&#039; Information about ISG ENI (high level overview, work program and deliverables).&lt;br /&gt;
&lt;br /&gt;
&amp;lt;span style=&amp;quot;font-size:14pt&amp;quot;&amp;gt;&lt;br /&gt;
&#039;&#039;&#039;ENI Proof of Concept (PoC) Activity:&#039;&#039;&#039;&lt;br /&gt;
&amp;lt;/span&amp;gt;&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[Ongoing PoCs]]&#039;&#039;&#039; Information about ongoing ISG ENI PoCs.&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[PoC Topics]]&#039;&#039;&#039; Information about ISG ENI PoC Topics.&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[PoC Framework]]&#039;&#039;&#039; Information about ISG ENI PoC Framework (process, criteria, templates....).&lt;br /&gt;
&lt;br /&gt;
* [[PoC Review Team]]&lt;br /&gt;
&lt;br /&gt;
&amp;lt;span style=&amp;quot;font-size:14pt&amp;quot;&amp;gt;&lt;br /&gt;
&#039;&#039;&#039;FAQ:&#039;&#039;&#039;&lt;br /&gt;
&amp;lt;/span&amp;gt;&lt;br /&gt;
* &#039;&#039;&#039;[[FAQ]]&#039;&#039;&#039; Frequently asked questions regarding ISG ENI (how to join, ect... To be completed).&lt;br /&gt;
&lt;br /&gt;
----&lt;br /&gt;
&lt;br /&gt;
 This Wiki is provided as a tool for the use of ISG ENI participants.&lt;br /&gt;
 You may need to login to access some information&lt;br /&gt;
&lt;br /&gt;
 &#039;&#039;&#039;    &amp;gt;&amp;gt;&amp;gt; ISG ENI participants can login with their ETSI OnLine (EOL) account &amp;lt;&amp;lt;&amp;lt;&#039;&#039;&#039;&lt;br /&gt;
 &lt;br /&gt;
 If you are an ISG ENI participant and do not have an EOL account yet, &lt;br /&gt;
 you can [http://webapp.etsi.org/createaccount apply for an EOL account], or send a request to [mailto:helpdesk@etsi.org ETSI helpdesk]&lt;br /&gt;
 &lt;br /&gt;
 For any other wiki related request, please [mailto:CTI_support@etsi.org?Subject=ISG_ENI_WIKI_request contact ETSI CTI]&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
 &#039;&#039;&#039;                                    [http://eniwiki.etsi.org/index.php?title=Special%3AUserLogin&amp;amp;returnto=Main+Page Login with your EOL account!]&#039;&#039;&#039;&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=Main_Page&amp;diff=44</id>
		<title>Main Page</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=Main_Page&amp;diff=44"/>
		<updated>2018-05-23T15:31:19Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&amp;lt;center&amp;gt;&lt;br /&gt;
&amp;lt;h1&amp;gt;Welcome to ISG ENI Wiki&amp;lt;/h1&amp;gt;&lt;br /&gt;
&amp;lt;/center&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;span style=&amp;quot;font-size:14pt&amp;quot;&amp;gt;&lt;br /&gt;
&#039;&#039;&#039;About ISG ENI:&#039;&#039;&#039;&lt;br /&gt;
&amp;lt;/span&amp;gt;&lt;br /&gt;
* &#039;&#039;&#039;[[ISG ENI Activities]]&#039;&#039;&#039; Information about ISG ENI (high level overview, work program and deliverables).&lt;br /&gt;
&lt;br /&gt;
&amp;lt;span style=&amp;quot;font-size:14pt&amp;quot;&amp;gt;&lt;br /&gt;
&#039;&#039;&#039;ENI Proof of Concept (PoC) Activity:&#039;&#039;&#039;&lt;br /&gt;
&amp;lt;/span&amp;gt;&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[Ongoing PoCs]]&#039;&#039;&#039; Information about ongoing ISG ENI PoCs.&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[PoC Topics]]&#039;&#039;&#039; Information about ISG ENI PoC Topics.&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[PoC Framework]]&#039;&#039;&#039; Information about ISG ENI PoC Framework (process, criteria, templates....).&lt;br /&gt;
&lt;br /&gt;
* [[PoC Review Team]]&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;FAQ:&#039;&#039;&#039;&lt;br /&gt;
* &#039;&#039;&#039;[[FAQ]]&#039;&#039;&#039; Frequently asked questions regarding ISG ENI (how to join, ect... To be completed).&lt;br /&gt;
&lt;br /&gt;
----&lt;br /&gt;
&lt;br /&gt;
 This Wiki is provided as a tool for the use of ISG ENI participants.&lt;br /&gt;
 You may need to login to access some information&lt;br /&gt;
&lt;br /&gt;
 &#039;&#039;&#039;    &amp;gt;&amp;gt;&amp;gt; ISG ENI participants can login with their ETSI OnLine (EOL) account &amp;lt;&amp;lt;&amp;lt;&#039;&#039;&#039;&lt;br /&gt;
 &lt;br /&gt;
 If you are an ISG ENI participant and do not have an EOL account yet, &lt;br /&gt;
 you can [http://webapp.etsi.org/createaccount apply for an EOL account], or send a request to [mailto:helpdesk@etsi.org ETSI helpdesk]&lt;br /&gt;
 &lt;br /&gt;
 For any other wiki related request, please [mailto:CTI_support@etsi.org?Subject=ISG_ENI_WIKI_request contact ETSI CTI]&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
 &#039;&#039;&#039;                                    [http://eniwiki.etsi.org/index.php?title=Special%3AUserLogin&amp;amp;returnto=Main+Page Login with your EOL account!]&#039;&#039;&#039;&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=FAQ&amp;diff=43</id>
		<title>FAQ</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=FAQ&amp;diff=43"/>
		<updated>2018-05-23T15:28:46Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: Created page with &amp;quot;__TOC__  = FAQ =  To be completed&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= FAQ =&lt;br /&gt;
&lt;br /&gt;
To be completed&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=Main_Page&amp;diff=42</id>
		<title>Main Page</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=Main_Page&amp;diff=42"/>
		<updated>2018-05-23T15:27:49Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&amp;lt;center&amp;gt;&lt;br /&gt;
&amp;lt;h1&amp;gt;Welcome to ISG ENI Wiki&amp;lt;/h1&amp;gt;&lt;br /&gt;
&amp;lt;/center&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;span style=&amp;quot;font-size:14pt&amp;quot;&amp;gt;&lt;br /&gt;
&#039;&#039;&#039;About ISG ENI:&#039;&#039;&#039;&lt;br /&gt;
&amp;lt;/span&amp;gt;&lt;br /&gt;
* &#039;&#039;&#039;[[ISG ENI Activities]]&#039;&#039;&#039; Information about ISG ENI (high level overview, work program and deliverables).&lt;br /&gt;
* &#039;&#039;&#039;[[FAQ]]&#039;&#039;&#039; Frequently asked questions regarding ISG ENI (how to join, ect... To be completed).&lt;br /&gt;
&lt;br /&gt;
&amp;lt;span style=&amp;quot;font-size:14pt&amp;quot;&amp;gt;&lt;br /&gt;
&#039;&#039;&#039;ENI Proof of Concept (PoC) Activity:&#039;&#039;&#039;&lt;br /&gt;
&amp;lt;/span&amp;gt;&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[Ongoing PoCs]]&#039;&#039;&#039; Information about ongoing ISG ENI PoCs.&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[PoC Topics]]&#039;&#039;&#039; Information about ISG ENI PoC Topics.&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[PoC Framework]]&#039;&#039;&#039; Information about ISG ENI PoC Framework (process, criteria, templates....).&lt;br /&gt;
&lt;br /&gt;
* [[PoC Review Team]]&lt;br /&gt;
----&lt;br /&gt;
&lt;br /&gt;
 This Wiki is provided as a tool for the use of ISG ENI participants.&lt;br /&gt;
 You may need to login to access some information&lt;br /&gt;
&lt;br /&gt;
 &#039;&#039;&#039;    &amp;gt;&amp;gt;&amp;gt; ISG ENI participants can login with their ETSI OnLine (EOL) account &amp;lt;&amp;lt;&amp;lt;&#039;&#039;&#039;&lt;br /&gt;
 &lt;br /&gt;
 If you are an ISG ENI participant and do not have an EOL account yet, &lt;br /&gt;
 you can [http://webapp.etsi.org/createaccount apply for an EOL account], or send a request to [mailto:helpdesk@etsi.org ETSI helpdesk]&lt;br /&gt;
 &lt;br /&gt;
 For any other wiki related request, please [mailto:CTI_support@etsi.org?Subject=ISG_ENI_WIKI_request contact ETSI CTI]&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
 &#039;&#039;&#039;                                    [http://eniwiki.etsi.org/index.php?title=Special%3AUserLogin&amp;amp;returnto=Main+Page Login with your EOL account!]&#039;&#039;&#039;&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=Main_Page&amp;diff=41</id>
		<title>Main Page</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=Main_Page&amp;diff=41"/>
		<updated>2018-05-23T15:26:14Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&amp;lt;center&amp;gt;&lt;br /&gt;
&amp;lt;h1&amp;gt;Welcome to ISG ENI Wiki&amp;lt;/h1&amp;gt;&lt;br /&gt;
&amp;lt;/center&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;span style=&amp;quot;font-size:14pt&amp;quot;&amp;gt;&lt;br /&gt;
&#039;&#039;&#039;About ISG ENI:&#039;&#039;&#039;&lt;br /&gt;
&amp;lt;/span&amp;gt;&lt;br /&gt;
* &#039;&#039;&#039;[[ISG ENI Activities]]&#039;&#039;&#039; Information about ISG ENI (high level overview, work program and deliverables).&lt;br /&gt;
&lt;br /&gt;
&amp;lt;span style=&amp;quot;font-size:14pt&amp;quot;&amp;gt;&lt;br /&gt;
&#039;&#039;&#039;ENI Proof of Concept (PoC) Activity:&#039;&#039;&#039;&lt;br /&gt;
&amp;lt;/span&amp;gt;&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[Ongoing PoCs]]&#039;&#039;&#039; Information about ongoing ISG ENI PoCs.&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[PoC Topics]]&#039;&#039;&#039; Information about ISG ENI PoC Topics.&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[PoC Framework]]&#039;&#039;&#039; Information about ISG ENI PoC Framework (process, criteria, templates....).&lt;br /&gt;
&lt;br /&gt;
* [[PoC Review Team]]&lt;br /&gt;
----&lt;br /&gt;
&lt;br /&gt;
 This Wiki is provided as a tool for the use of ISG ENI participants.&lt;br /&gt;
 You may need to login to access some information&lt;br /&gt;
&lt;br /&gt;
 &#039;&#039;&#039;    &amp;gt;&amp;gt;&amp;gt; ISG ENI participants can login with their ETSI OnLine (EOL) account &amp;lt;&amp;lt;&amp;lt;&#039;&#039;&#039;&lt;br /&gt;
 &lt;br /&gt;
 If you are an ISG ENI participant and do not have an EOL account yet, &lt;br /&gt;
 you can [http://webapp.etsi.org/createaccount apply for an EOL account], or send a request to [mailto:helpdesk@etsi.org ETSI helpdesk]&lt;br /&gt;
 &lt;br /&gt;
 For any other wiki related request, please [mailto:CTI_support@etsi.org?Subject=ISG_ENI_WIKI_request contact ETSI CTI]&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
 &#039;&#039;&#039;                                    [http://eniwiki.etsi.org/index.php?title=Special%3AUserLogin&amp;amp;returnto=Main+Page Login with your EOL account!]&#039;&#039;&#039;&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=Main_Page&amp;diff=40</id>
		<title>Main Page</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=Main_Page&amp;diff=40"/>
		<updated>2018-05-23T15:24:03Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&amp;lt;center&amp;gt;&lt;br /&gt;
&amp;lt;h1&amp;gt;Welcome to ISG ENI Wiki&amp;lt;/h1&amp;gt;&lt;br /&gt;
&amp;lt;/center&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;span style=&amp;quot;font-size:14pt&amp;quot;&amp;gt;&lt;br /&gt;
&#039;&#039;&#039;About ISG ENI:&#039;&#039;&#039;&lt;br /&gt;
&amp;lt;/span&amp;gt;&lt;br /&gt;
* &#039;&#039;&#039;[[ISG ENI Activities]]&#039;&#039;&#039; Information about ISG ENI (high level overview and work program).&lt;br /&gt;
&lt;br /&gt;
&amp;lt;span style=&amp;quot;font-size:14pt&amp;quot;&amp;gt;&lt;br /&gt;
&#039;&#039;&#039;ENI Proof of Concept (PoC) Activity:&#039;&#039;&#039;&lt;br /&gt;
&amp;lt;/span&amp;gt;&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[Ongoing PoCs]]&#039;&#039;&#039; Information about ongoing ISG ENI PoCs.&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[PoC Topics]]&#039;&#039;&#039; Information about ISG ENI PoC Topics.&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[PoC Framework]]&#039;&#039;&#039; Information about ISG ENI PoC Framework (process, criteria, templates....).&lt;br /&gt;
&lt;br /&gt;
* [[PoC Review Team]]&lt;br /&gt;
----&lt;br /&gt;
&lt;br /&gt;
 This Wiki is provided as a tool for the use of ISG ENI participants.&lt;br /&gt;
 You may need to login to access some information&lt;br /&gt;
&lt;br /&gt;
 &#039;&#039;&#039;    &amp;gt;&amp;gt;&amp;gt; ISG ENI participants can login with their ETSI OnLine (EOL) account &amp;lt;&amp;lt;&amp;lt;&#039;&#039;&#039;&lt;br /&gt;
 &lt;br /&gt;
 If you are an ISG ENI participant and do not have an EOL account yet, &lt;br /&gt;
 you can [http://webapp.etsi.org/createaccount apply for an EOL account], or send a request to [mailto:helpdesk@etsi.org ETSI helpdesk]&lt;br /&gt;
 &lt;br /&gt;
 For any other wiki related request, please [mailto:CTI_support@etsi.org?Subject=ISG_ENI_WIKI_request contact ETSI CTI]&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
 &#039;&#039;&#039;                                    [http://eniwiki.etsi.org/index.php?title=Special%3AUserLogin&amp;amp;returnto=Main+Page Login with your EOL account!]&#039;&#039;&#039;&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=39</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=39"/>
		<updated>2018-05-23T15:18:33Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Recently published deliverables */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
= Recently published deliverables =&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039; ETSI GR ENI 001&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI use cases&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
&lt;br /&gt;
: For full details and schedule click [here]https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52850#_blank.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GS ENI 002&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI requirements&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52851#_blank&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GR ENI 003&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52852#_blank&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques.&lt;br /&gt;
&lt;br /&gt;
ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
&lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework.&lt;br /&gt;
&lt;br /&gt;
= ISG ENI members and participants =&lt;br /&gt;
&lt;br /&gt;
The full list of ENI Members and participants is available [here] https://portal.etsi.org/TBSiteMap/ENI/ListOfENIMembers.aspx&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=38</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=38"/>
		<updated>2018-05-23T15:18:03Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Recently published deliverables */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
= Recently published deliverables =&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039; ETSI GR ENI 001&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI use cases&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
&lt;br /&gt;
: For full details and schedule click [here]https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52850#_blank.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GS ENI 002&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI requirements&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52851#_blank&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GR ENI 003&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52852#_blank&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
&lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework.&lt;br /&gt;
&lt;br /&gt;
= ISG ENI members and participants =&lt;br /&gt;
&lt;br /&gt;
The full list of ENI Members and participants is available [here] https://portal.etsi.org/TBSiteMap/ENI/ListOfENIMembers.aspx&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=37</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=37"/>
		<updated>2018-05-23T15:17:37Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Recently published deliverables */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
= Recently published deliverables =&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039; ETSI GR ENI 001&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI use cases&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
&lt;br /&gt;
: For full details and schedule click [here]https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52850#_blank.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GS ENI 002&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI requirements&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52851#_blank&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GR ENI 003&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52852#_blank&lt;br /&gt;
&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques.&lt;br /&gt;
&lt;br /&gt;
ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
&lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework.&lt;br /&gt;
&lt;br /&gt;
= ISG ENI members and participants =&lt;br /&gt;
&lt;br /&gt;
The full list of ENI Members and participants is available [here] https://portal.etsi.org/TBSiteMap/ENI/ListOfENIMembers.aspx&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=36</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=36"/>
		<updated>2018-05-23T15:17:05Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Recently published deliverables */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
= Recently published deliverables =&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039; ETSI GR ENI 001&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI use cases&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
&lt;br /&gt;
: For full details and schedule click [here]https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52850#_blank.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GS ENI 002&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI requirements&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52851#_blank&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GR ENI 003&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click [here] https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52852#_blank&lt;br /&gt;
&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques.&lt;br /&gt;
ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
&lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework. &lt;br /&gt;
&lt;br /&gt;
= ISG ENI members and participants =&lt;br /&gt;
&lt;br /&gt;
The full list of ENI Members and participants is available [here] https://portal.etsi.org/TBSiteMap/ENI/ListOfENIMembers.aspx&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=35</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=35"/>
		<updated>2018-05-23T15:12:01Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Recently published deliverables */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
= Recently published deliverables =&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039; ETSI GR ENI 001&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI use cases&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
&lt;br /&gt;
: For full details and schedule click [here]https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52850#_blank.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GS ENI 002&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI requirements&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click here&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GR ENI 003&#039;&#039;&#039;&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&#039;&#039;&#039;&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
: For full details and schedule click here.&lt;br /&gt;
&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques. ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework. &lt;br /&gt;
&lt;br /&gt;
ISG ENI has presently 33 Members /Participants.&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=34</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=34"/>
		<updated>2018-05-23T15:09:43Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Recently published deliverables */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
= Recently published deliverables =&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039; ETSI GR ENI 001&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
: Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI use cases&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
: Target procedure or publication version: V1.1.1&lt;br /&gt;
&lt;br /&gt;
: For full details and schedule click [here]https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52850#_blank.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
*&#039;&#039;&#039;ETSI GR ENI 001&#039;&#039;&#039;&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI requirements&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GR ENI 003&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
Two more in Publication at the moment.&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques. ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework. &lt;br /&gt;
ISG ENI has presently 33 Members /Participants.&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=33</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=33"/>
		<updated>2018-05-23T14:40:20Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Recently published deliverables */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
= Recently published deliverables =&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;- ETSI GR ENI 001&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Work Item Title: &#039;&#039;&#039;Experiential Networked Intelligence (ENI); ENI use cases&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
&lt;br /&gt;
For full details and schedule click [here]https://webapp.etsi.org/workprogram/Report_WorkItem.asp?WKI_ID=52850#_blank.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GS ENI 002&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI requirements&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GR ENI 003&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
Two more in Publication at the moment.&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques. ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework. &lt;br /&gt;
ISG ENI has presently 33 Members /Participants.&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=32</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=32"/>
		<updated>2018-05-23T14:36:45Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* About ISG ENI */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
= Recently published deliverables =&lt;br /&gt;
&lt;br /&gt;
#&#039;&#039;&#039; ETSI GR ENI 001&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI use cases&lt;br /&gt;
&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GS ENI 002&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI requirements&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GR ENI 003&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
Two more in Publication at the moment.&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques. ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework. &lt;br /&gt;
ISG ENI has presently 33 Members /Participants.&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=31</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=31"/>
		<updated>2018-05-23T14:35:16Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* About ISG ENI */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;Recently published deliverables&#039;&#039;&#039;:&lt;br /&gt;
&lt;br /&gt;
----&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;# ETSI GR ENI 001&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI use cases&lt;br /&gt;
&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GS ENI 002&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI requirements&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GR ENI 003&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
Two more in Publication at the moment.&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques. ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework. &lt;br /&gt;
ISG ENI has presently 33 Members /Participants.&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=30</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=30"/>
		<updated>2018-05-23T07:59:15Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* About ISG ENI */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;Recently published deliverables&#039;&#039;&#039;:&lt;br /&gt;
&lt;br /&gt;
----&lt;br /&gt;
&lt;br /&gt;
ETSI GR ENI 001&lt;br /&gt;
&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI use cases&lt;br /&gt;
&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GS ENI 002&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI requirements&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GR ENI 003&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
Two more in Publication at the moment.&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques. ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework. &lt;br /&gt;
ISG ENI has presently 33 Members /Participants.&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=29</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=29"/>
		<updated>2018-05-23T07:57:59Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;Recently published deliverables&#039;&#039;&#039;:&lt;br /&gt;
ETSI GR ENI 001&lt;br /&gt;
&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI use cases&lt;br /&gt;
&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GS ENI 002&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI requirements&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GR ENI 003&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
Two more in Publication at the moment.&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques. ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework. &lt;br /&gt;
ISG ENI has presently 33 Members /Participants.&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=28</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=28"/>
		<updated>2018-05-23T07:57:45Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;Recently published deliverables&#039;&#039;&#039;:&lt;br /&gt;
ETSI GR ENI 001&lt;br /&gt;
&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI use cases&lt;br /&gt;
&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GS ENI 002&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI requirements&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GR ENI 003&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
Two more in Publication at the moment.&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques. ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework. &lt;br /&gt;
ISG ENI has presently 33 Members /Participants.&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=27</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=27"/>
		<updated>2018-05-22T18:19:20Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
&lt;br /&gt;
ENI has published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;Recently published deliverables&#039;&#039;&#039;:&lt;br /&gt;
ETSI GR ENI 001&lt;br /&gt;
&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI use cases&lt;br /&gt;
&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GS ENI 002&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI requirements&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GR ENI 003&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
Two more in Publication at the moment.&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques. ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework. &lt;br /&gt;
ISG ENI has presently 33 Members /Participants.&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=26</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=26"/>
		<updated>2018-05-22T18:16:48Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
&lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
ENI has Published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
Recently published deliverables:&lt;br /&gt;
Work Item details: ETSI Number: GR ENI 001&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI use cases&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GS ENI 002&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI requirements&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GR ENI 003&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
Two more in Publication at the moment.&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques. ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework. &lt;br /&gt;
ISG ENI has presently 33 Members /Participants.&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=25</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=25"/>
		<updated>2018-05-22T18:16:21Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* About ISG ENI */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
ENI has Published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
Recently published deliverables:&lt;br /&gt;
Work Item details: ETSI Number: GR ENI 001&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI use cases&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GS ENI 002&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI requirements&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GR ENI 003&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
Two more in Publication at the moment.&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques. ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework. &lt;br /&gt;
ISG ENI has presently 33 Members /Participants.&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=24</id>
		<title>ISG ENI Activities</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=ISG_ENI_Activities&amp;diff=24"/>
		<updated>2018-05-22T18:15:16Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: Created page with &amp;quot;__TOC__  = About ISG ENI = ISG ENI - Industry Specification Group on Experiential Networked Intelligence  ENI focuses on improving the operator experience, adding closed-loop...&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
ISG ENI - Industry Specification Group on Experiential Networked Intelligence&lt;br /&gt;
&lt;br /&gt;
ENI focuses on improving the operator experience, adding closed-loop AI mechanisms based on context-aware, metadata-driven policies to more quickly recognize and incorporate new and changed knowledge, and hence, make actionable decisions. &lt;br /&gt;
ENI has launched a continuing Proof of Concepts activity. A PoC review team including was created and tasked with reviewing incoming proposals. The PoC activity is supported by Vodafone, TIM, China Telecom, PT, Aria-Networks, Samsung and Huawei. Each PoC Team proposal shall address at least one goal relevant to ENI, related with an ENI Use Case, an ENI Requirements or the suitability of the ENI System Architecture aspect. The output of each PoC project shall contribute to the completion of the version 2 specifications within ISG ENI. To improve the output of the Work-items. Alignment with existing activities is required. Each PoC Proposal will provide proof of the technical feasibility of ENI within the Industry.&lt;br /&gt;
ENI has specified a set of use cases and the derived requirements for a generic technology independent architecture of a network supervisory assistant system based on the ‘observe-orient-decide-act’ control loop model. This model gives recommendations to decision-making systems, such as network control and management systems, to adjust services and resources offered based on changes in user needs, environmental conditions and business goals. A gap analysis of work on context-aware and policy-based standards has been considered, reviewing other Standards Developing Organizations to reuse existing standardized solutions for legacy and evolving network functions wherever possible. Security and a closed loop learning policy-model are subjects to be addressed shortly.&lt;br /&gt;
ENI has Published version 1 of the Use cases, Requirements, Context Aware Policy Management, terminology and a Proof of Concept (PoC) Framework. &lt;br /&gt;
Recently published deliverables:&lt;br /&gt;
Work Item details: ETSI Number: GR ENI 001&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI use cases&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GS ENI 002&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); ENI requirements&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here&lt;br /&gt;
Work Item details:&lt;br /&gt;
ETSI Number: GR ENI 003&lt;br /&gt;
Work Item Title: Experiential Networked Intelligence (ENI); Context-Aware Policy Management Gap Analysis&lt;br /&gt;
Target procedure or publication version: V1.1.1&lt;br /&gt;
For full details and schedule click here.&lt;br /&gt;
Two more in Publication at the moment.&lt;br /&gt;
The System Architecture is being specified, with a new draft including a high-level architecture using AI techniques. ENI has opened new work-items to collect version 2 of the Use cases, Requirements and terminology. &lt;br /&gt;
Proof of Concept (PoC) Proposals are called for in line with the approved PoC framework. &lt;br /&gt;
ISG ENI has presently 33 Members /Participants. &lt;br /&gt;
a, etc...&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=Main_Page&amp;diff=23</id>
		<title>Main Page</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=Main_Page&amp;diff=23"/>
		<updated>2018-05-22T18:09:39Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&amp;lt;center&amp;gt;&lt;br /&gt;
&amp;lt;h1&amp;gt;Welcome to ISG ENI Wiki&amp;lt;/h1&amp;gt;&lt;br /&gt;
&amp;lt;/center&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;span style=&amp;quot;font-size:14pt&amp;quot;&amp;gt;&lt;br /&gt;
&#039;&#039;&#039;About ISG ENI:&#039;&#039;&#039;&lt;br /&gt;
&amp;lt;/span&amp;gt;&lt;br /&gt;
* &#039;&#039;&#039;[[ISG ENI Activities]]&#039;&#039;&#039; Information about ISG ENI (high level overview and work program).&lt;br /&gt;
&lt;br /&gt;
&amp;lt;span style=&amp;quot;font-size:14pt&amp;quot;&amp;gt;&lt;br /&gt;
&#039;&#039;&#039;ENI PoC Activity:&#039;&#039;&#039;&lt;br /&gt;
&amp;lt;/span&amp;gt;&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[Ongoing PoCs]]&#039;&#039;&#039; Information about ongoing ISG ENI PoCs.&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[PoC Topics]]&#039;&#039;&#039; Information about ISG ENI PoC Topics.&lt;br /&gt;
&lt;br /&gt;
* &#039;&#039;&#039;[[PoC Framework]]&#039;&#039;&#039; Information about ISG ENI PoC Framework (process, criteria, templates....).&lt;br /&gt;
&lt;br /&gt;
* [[PoC Review Team]]&lt;br /&gt;
----&lt;br /&gt;
&lt;br /&gt;
 This Wiki is provided as a tool for the use of ISG ENI participants.&lt;br /&gt;
 You may need to login to access some information&lt;br /&gt;
&lt;br /&gt;
 &#039;&#039;&#039;    &amp;gt;&amp;gt;&amp;gt; ISG ENI participants can login with their ETSI OnLine (EOL) account &amp;lt;&amp;lt;&amp;lt;&#039;&#039;&#039;&lt;br /&gt;
 &lt;br /&gt;
 If you are an ISG ENI participant and do not have an EOL account yet, &lt;br /&gt;
 you can [http://webapp.etsi.org/createaccount apply for an EOL account], or send a request to [mailto:helpdesk@etsi.org ETSI helpdesk]&lt;br /&gt;
 &lt;br /&gt;
 For any other wiki related request, please [mailto:CTI_support@etsi.org?Subject=ISG_ENI_WIKI_request contact ETSI CTI]&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
 &#039;&#039;&#039;                                    [http://eniwiki.etsi.org/index.php?title=Special%3AUserLogin&amp;amp;returnto=Main+Page Login with your EOL account!]&#039;&#039;&#039;&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=PoC_Framework&amp;diff=22</id>
		<title>PoC Framework</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=PoC_Framework&amp;diff=22"/>
		<updated>2018-05-18T14:14:36Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Submitting a PoC Proposal */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= ENI PoC Framework Document =&lt;br /&gt;
The ENI Proof of Concept (PoC) Framework GS describes the full ISG ENI PoC activity process, roles, responsibilities, acceptance criteria, etc...&lt;br /&gt;
&lt;br /&gt;
The latest version of this document can be downloaded here: TBD.&lt;br /&gt;
&lt;br /&gt;
For convenience of the PoC Teams, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.&lt;br /&gt;
&lt;br /&gt;
= Templates =&lt;br /&gt;
&lt;br /&gt;
   Work in progress&lt;br /&gt;
&lt;br /&gt;
   Work in progress&lt;br /&gt;
&lt;br /&gt;
= PoC Topics =&lt;br /&gt;
&lt;br /&gt;
PoC Projects are expected to be scoped arround PoC Topics identified and agreed by ISG ENI . [[PoC Topics|See details and current list of PoC Topics]].&lt;br /&gt;
&lt;br /&gt;
= Submitting a PoC Proposal =&lt;br /&gt;
# The PoC Team fills in the PoC Proposal template.&lt;br /&gt;
# The PoC Team uploads the completed proposal to the ETSI portal as a contribution to ENI.&lt;br /&gt;
# The PoC Team sends an email to the PoC Review Team.&lt;br /&gt;
# ENI PoC Review Team sends an e-mail containing the link to the proposal to the distribution list &#039;ISG_ENI@LIST.ETSI.ORG&#039; with [ENI ISG PoC Proposal] in the subject line.&lt;br /&gt;
&lt;br /&gt;
= Acceptance Criteria =&lt;br /&gt;
&lt;br /&gt;
The criteria for acceptance of ENI ISG PoC Proposals are:&lt;br /&gt;
#The ENI ISG PoC Proposal shall contain the information requested in the format of the ENI ISG PoC Proposal Template of clause A.1 GS ENI 006, referred to as the PoC Team. This will be checked by ETSI CTI and the PoC Review Team.&lt;br /&gt;
#The organizations participating in an PoC Team shall include at least two Manufacturers and at least one Network Operator or one Service Provider, where at least one Network Operator or one Service Provider shall be a member of the ENI ISG (refer to clause A.1.1 of  GS ENI 006).&lt;br /&gt;
#The ENI ISG PoC Team proposal shall address at least one goal relevant to ENI i.e. related with an ENI Use Cases, an ENI Requirements or the suitability of an ENI System Architecture aspect (refer to clause A.1.3.1 of GS ENI 006).The output of the PoC should provide feedback to the ISG ENI that should support the improvement of the output of the existing WIs. Alignment with existing activities is required.&lt;br /&gt;
#The ENI ISG PoC Team proposal shall indicate the venue where the PoC will be demonstrated (e.g. PoC Team member lab, industry trade show, etc.) (refer to clause A.1.5 of GS ENI 006).&lt;br /&gt;
#A PoC Team project timeline shall be provided (refer to clause A.1.4 of GS ENI 006). &lt;br /&gt;
&lt;br /&gt;
Any ENI ISG PoC Proposal which meets these required elements will be accepted.&lt;br /&gt;
&lt;br /&gt;
= CTI support =&lt;br /&gt;
The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management. &lt;br /&gt;
&lt;br /&gt;
ENI PoC Teams may request CTI assistance by [mailto:CTI_Support@etsi.org?Subject=ENI_PoC-Support_Request contacting ETSI CTI].&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
&lt;br /&gt;
   Work in progress&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=PoC_Framework&amp;diff=21</id>
		<title>PoC Framework</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=PoC_Framework&amp;diff=21"/>
		<updated>2018-05-18T13:22:12Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Acceptance Criteria */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= ENI PoC Framework Document =&lt;br /&gt;
The ENI Proof of Concept (PoC) Framework GS describes the full ISG ENI PoC activity process, roles, responsibilities, acceptance criteria, etc...&lt;br /&gt;
&lt;br /&gt;
The latest version of this document can be downloaded here: TBD.&lt;br /&gt;
&lt;br /&gt;
For convenience of the PoC Teams, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.&lt;br /&gt;
&lt;br /&gt;
= Templates =&lt;br /&gt;
&lt;br /&gt;
   Work in progress&lt;br /&gt;
&lt;br /&gt;
   Work in progress&lt;br /&gt;
&lt;br /&gt;
= PoC Topics =&lt;br /&gt;
&lt;br /&gt;
PoC Projects are expected to be scoped arround PoC Topics identified and agreed by ISG ENI . [[PoC Topics|See details and current list of PoC Topics]].&lt;br /&gt;
&lt;br /&gt;
= Submitting a PoC Proposal =&lt;br /&gt;
# The PoC Team fills in the PoC Proposal template &lt;br /&gt;
# The PoC Team uploads the completed proposal to the ETSI portal as a contribution to ENI &lt;br /&gt;
# The PoC Team sends an email to the TBD containing the link to the proposal&lt;br /&gt;
&lt;br /&gt;
= Acceptance Criteria =&lt;br /&gt;
&lt;br /&gt;
The criteria for acceptance of ENI ISG PoC Proposals are:&lt;br /&gt;
#The ENI ISG PoC Proposal shall contain the information requested in the format of the ENI ISG PoC Proposal Template of clause A.1 GS ENI 006, referred to as the PoC Team. This will be checked by ETSI CTI and the PoC Review Team.&lt;br /&gt;
#The organizations participating in an PoC Team shall include at least two Manufacturers and at least one Network Operator or one Service Provider, where at least one Network Operator or one Service Provider shall be a member of the ENI ISG (refer to clause A.1.1 of  GS ENI 006).&lt;br /&gt;
#The ENI ISG PoC Team proposal shall address at least one goal relevant to ENI i.e. related with an ENI Use Cases, an ENI Requirements or the suitability of an ENI System Architecture aspect (refer to clause A.1.3.1 of GS ENI 006).The output of the PoC should provide feedback to the ISG ENI that should support the improvement of the output of the existing WIs. Alignment with existing activities is required.&lt;br /&gt;
#The ENI ISG PoC Team proposal shall indicate the venue where the PoC will be demonstrated (e.g. PoC Team member lab, industry trade show, etc.) (refer to clause A.1.5 of GS ENI 006).&lt;br /&gt;
#A PoC Team project timeline shall be provided (refer to clause A.1.4 of GS ENI 006). &lt;br /&gt;
&lt;br /&gt;
Any ENI ISG PoC Proposal which meets these required elements will be accepted.&lt;br /&gt;
&lt;br /&gt;
= CTI support =&lt;br /&gt;
The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management. &lt;br /&gt;
&lt;br /&gt;
ENI PoC Teams may request CTI assistance by [mailto:CTI_Support@etsi.org?Subject=ENI_PoC-Support_Request contacting ETSI CTI].&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
&lt;br /&gt;
   Work in progress&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=PoC_Framework&amp;diff=20</id>
		<title>PoC Framework</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=PoC_Framework&amp;diff=20"/>
		<updated>2018-05-18T13:21:15Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Acceptance Criteria */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= ENI PoC Framework Document =&lt;br /&gt;
The ENI Proof of Concept (PoC) Framework GS describes the full ISG ENI PoC activity process, roles, responsibilities, acceptance criteria, etc...&lt;br /&gt;
&lt;br /&gt;
The latest version of this document can be downloaded here: TBD.&lt;br /&gt;
&lt;br /&gt;
For convenience of the PoC Teams, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.&lt;br /&gt;
&lt;br /&gt;
= Templates =&lt;br /&gt;
&lt;br /&gt;
   Work in progress&lt;br /&gt;
&lt;br /&gt;
   Work in progress&lt;br /&gt;
&lt;br /&gt;
= PoC Topics =&lt;br /&gt;
&lt;br /&gt;
PoC Projects are expected to be scoped arround PoC Topics identified and agreed by ISG ENI . [[PoC Topics|See details and current list of PoC Topics]].&lt;br /&gt;
&lt;br /&gt;
= Submitting a PoC Proposal =&lt;br /&gt;
# The PoC Team fills in the PoC Proposal template &lt;br /&gt;
# The PoC Team uploads the completed proposal to the ETSI portal as a contribution to ENI &lt;br /&gt;
# The PoC Team sends an email to the TBD containing the link to the proposal&lt;br /&gt;
&lt;br /&gt;
= Acceptance Criteria =&lt;br /&gt;
&lt;br /&gt;
The criteria for acceptance of ENI ISG PoC Proposals are:&lt;br /&gt;
#The ENI ISG PoC Proposal shall contain the information requested in the format of the ENI ISG PoC Proposal Template of clause A.1 GS ENI 006, referred to as the PoC Team. This will be checked by ETSI CTI and the PoC Review Team.&lt;br /&gt;
#The organizations participating in an PoC Team shall include at least two Manufacturers and at least one Network Operator or one Service Provider, where at least one Network Operator or one Service Provider shall be a member of the ENI ISG (refer to GS ENI 006 clause A.1.1 ).&lt;br /&gt;
#The ENI ISG PoC Team proposal shall address at least one goal relevant to ENI i.e. related with an ENI Use Cases, an ENI Requirements or the suitability of an ENI System Architecture aspect (refer to clause A.1.3.1 of GS ENI 006).The output of the PoC should provide feedback to the ISG ENI that should support the improvement of the output of the existing WIs. Alignment with existing activities is required.&lt;br /&gt;
#The ENI ISG PoC Team proposal shall indicate the venue where the PoC will be demonstrated (e.g. PoC Team member lab, industry trade show, etc.) (refer to clause A.1.5 of GS ENI 006).&lt;br /&gt;
#A PoC Team project timeline shall be provided (refer to clause A.1.4 of GS ENI 006). &lt;br /&gt;
&lt;br /&gt;
Any ENI ISG PoC Proposal which meets these required elements will be accepted.&lt;br /&gt;
&lt;br /&gt;
= CTI support =&lt;br /&gt;
The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management. &lt;br /&gt;
&lt;br /&gt;
ENI PoC Teams may request CTI assistance by [mailto:CTI_Support@etsi.org?Subject=ENI_PoC-Support_Request contacting ETSI CTI].&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
&lt;br /&gt;
   Work in progress&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=PoC_Framework&amp;diff=19</id>
		<title>PoC Framework</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=PoC_Framework&amp;diff=19"/>
		<updated>2018-05-18T13:20:40Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Acceptance Criteria */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= ENI PoC Framework Document =&lt;br /&gt;
The ENI Proof of Concept (PoC) Framework GS describes the full ISG ENI PoC activity process, roles, responsibilities, acceptance criteria, etc...&lt;br /&gt;
&lt;br /&gt;
The latest version of this document can be downloaded here: TBD.&lt;br /&gt;
&lt;br /&gt;
For convenience of the PoC Teams, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.&lt;br /&gt;
&lt;br /&gt;
= Templates =&lt;br /&gt;
&lt;br /&gt;
   Work in progress&lt;br /&gt;
&lt;br /&gt;
   Work in progress&lt;br /&gt;
&lt;br /&gt;
= PoC Topics =&lt;br /&gt;
&lt;br /&gt;
PoC Projects are expected to be scoped arround PoC Topics identified and agreed by ISG ENI . [[PoC Topics|See details and current list of PoC Topics]].&lt;br /&gt;
&lt;br /&gt;
= Submitting a PoC Proposal =&lt;br /&gt;
# The PoC Team fills in the PoC Proposal template &lt;br /&gt;
# The PoC Team uploads the completed proposal to the ETSI portal as a contribution to ENI &lt;br /&gt;
# The PoC Team sends an email to the TBD containing the link to the proposal&lt;br /&gt;
&lt;br /&gt;
= Acceptance Criteria =&lt;br /&gt;
&lt;br /&gt;
The criteria for acceptance of ENI ISG PoC Proposals are:&lt;br /&gt;
# 1) The ENI ISG PoC Proposal shall contain the information requested in the format of the ENI ISG PoC Proposal Template of clause A.1 GS ENI 006, referred to as the PoC Team. This will be checked by ETSI CTI and the PoC Review Team.&lt;br /&gt;
# 2) The organizations participating in an PoC Team shall include at least two Manufacturers and at least one Network Operator or one Service Provider, where at least one Network Operator or one Service Provider shall be a member of the ENI ISG (refer to GS ENI 006 clause A.1.1 ).&lt;br /&gt;
# 3) The ENI ISG PoC Team proposal shall address at least one goal relevant to ENI i.e. related with an ENI Use Cases, an ENI Requirements or the suitability of an ENI System Architecture aspect (refer to clause A.1.3.1 of GS ENI 006).The output of the PoC should provide feedback to the ISG ENI that should support the improvement of the output of the existing WIs. Alignment with existing activities is required.&lt;br /&gt;
# 4) The ENI ISG PoC Team proposal shall indicate the venue where the PoC will be demonstrated (e.g. PoC Team member lab, industry trade show, etc.) (refer to clause A.1.5 of GS ENI 006).&lt;br /&gt;
# 5) A PoC Team project timeline shall be provided (refer to clause A.1.4 of GS ENI 006). &lt;br /&gt;
&lt;br /&gt;
#Any ENI ISG PoC Proposal which meets these required elements will be accepted.&lt;br /&gt;
&lt;br /&gt;
= CTI support =&lt;br /&gt;
The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management. &lt;br /&gt;
&lt;br /&gt;
ENI PoC Teams may request CTI assistance by [mailto:CTI_Support@etsi.org?Subject=ENI_PoC-Support_Request contacting ETSI CTI].&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
&lt;br /&gt;
   Work in progress&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=PoC_Framework&amp;diff=18</id>
		<title>PoC Framework</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=PoC_Framework&amp;diff=18"/>
		<updated>2018-05-18T13:09:59Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* Acceptance Criteria */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;__TOC__&lt;br /&gt;
&lt;br /&gt;
= ENI PoC Framework Document =&lt;br /&gt;
The ENI Proof of Concept (PoC) Framework GS describes the full ISG ENI PoC activity process, roles, responsibilities, acceptance criteria, etc...&lt;br /&gt;
&lt;br /&gt;
The latest version of this document can be downloaded here: TBD.&lt;br /&gt;
&lt;br /&gt;
For convenience of the PoC Teams, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.&lt;br /&gt;
&lt;br /&gt;
= Templates =&lt;br /&gt;
&lt;br /&gt;
   Work in progress&lt;br /&gt;
&lt;br /&gt;
   Work in progress&lt;br /&gt;
&lt;br /&gt;
= PoC Topics =&lt;br /&gt;
&lt;br /&gt;
PoC Projects are expected to be scoped arround PoC Topics identified and agreed by ISG ENI . [[PoC Topics|See details and current list of PoC Topics]].&lt;br /&gt;
&lt;br /&gt;
= Submitting a PoC Proposal =&lt;br /&gt;
# The PoC Team fills in the PoC Proposal template &lt;br /&gt;
# The PoC Team uploads the completed proposal to the ETSI portal as a contribution to ENI &lt;br /&gt;
# The PoC Team sends an email to the TBD containing the link to the proposal&lt;br /&gt;
&lt;br /&gt;
= Acceptance Criteria =&lt;br /&gt;
&lt;br /&gt;
   The criteria for acceptance of ENI ISG PoC Proposals are:&lt;br /&gt;
1)	The ENI ISG PoC Proposal shall contain the information requested in the format of the ENI ISG PoC Proposal Template of clause A.1, referrted to as the PoC Team. 	This will be checked by ETSI CTI and the PoC Review Team&lt;br /&gt;
2)	The organizations participating in an PoC Team shall include at least two Manufacturers and at least one Network Operator or one Service Provider, where at least one Network Operator or one Service Provider shall be a member of the ENI ISG (refer to clause A.1.1).&lt;br /&gt;
3)	The ENI ISG PoC Team proposal shall address at least one goal relevant to ENI i.e. related with an ENI Use Cases [2], an ENI Requirements [3] or the suitibilty of an ENI System Architecture [i.4] aspect(refer to clause A.1.3.1).The ouput of the PoC should provide feedback to the ISG ENI that should support the improvement of the output of the existing WIs. Alignment with exsting activities is required.&lt;br /&gt;
4)	The ENI ISG PoC Team proposal shall indicate the venue where the PoC will be demonstrated (e.g. PoC Team member lab, industry trade show, etc.) (refer to clause A.1.5).&lt;br /&gt;
5)	A PoC Team project timeline shall be provided (refer to clause A.1.4). &lt;br /&gt;
Any ENI ISG PoC Proposal which meets these required elements will be accepted.&lt;br /&gt;
&lt;br /&gt;
= CTI support =&lt;br /&gt;
The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management. &lt;br /&gt;
&lt;br /&gt;
ENI PoC Teams may request CTI assistance by [mailto:CTI_Support@etsi.org?Subject=ENI_PoC-Support_Request contacting ETSI CTI].&lt;br /&gt;
&lt;br /&gt;
= About ISG ENI =&lt;br /&gt;
&lt;br /&gt;
   Work in progress&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
	<entry>
		<id>https://eniwiki.etsi.org/index.php?title=PoC_Topics&amp;diff=17</id>
		<title>PoC Topics</title>
		<link rel="alternate" type="text/html" href="https://eniwiki.etsi.org/index.php?title=PoC_Topics&amp;diff=17"/>
		<updated>2018-05-18T12:56:37Z</updated>

		<summary type="html">&lt;p&gt;Korycinska: /* ENI PoC Topics */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;= Rationale = &lt;br /&gt;
ENI PoC Topics are specific areas, often linked to a Work Item, where input or feedback from the ENI Proofs of Concept is needed.  ENI PoC Topics help to focus PoC Projects on the most relevant topics for the ISG ENI, and to increase the relevance of their contributions.&lt;br /&gt;
&lt;br /&gt;
ENI PoC Topics are identified and documented by ISG ENI. ENI PoC Topics may include templates for the PoC Contributions and deadlines to ensure that the PoC Contributions arrive on-time to be taken into account by the targeted WIs.&lt;br /&gt;
&lt;br /&gt;
= ENI PoC Topics =&lt;br /&gt;
&lt;br /&gt;
As described in the ENI PoC Framework, a PoC Team proposal shall address at least one goal relevant to ENI i.e. related with an ENI Use Cases, an ENI Requirements or the suitability of an ENI System Architecture aspect. The output of the PoC should provide feedback to the ISG ENI that should support the improvement of the output of the existing WIs. Alignment with existing activities is required. See table below.&lt;br /&gt;
&lt;br /&gt;
{| class=&amp;quot;wikitable&amp;quot;&lt;br /&gt;
! &lt;br /&gt;
! style=&amp;quot;font-weight:bold;&amp;quot; | Level 1&lt;br /&gt;
! style=&amp;quot;font-weight:bold;&amp;quot; | Level 2&lt;br /&gt;
|-&lt;br /&gt;
| rowspan=&amp;quot;13&amp;quot; style=&amp;quot;font-weight:bold;&amp;quot; | Use Case&lt;br /&gt;
| rowspan=&amp;quot;5&amp;quot; style=&amp;quot;font-weight:bold;&amp;quot; | Network Operations&lt;br /&gt;
| Policy-driven IP managed networks&lt;br /&gt;
|-&lt;br /&gt;
| Radio coverage and capacity optimization&lt;br /&gt;
|-&lt;br /&gt;
| Intelligent software rollouts&lt;br /&gt;
|-&lt;br /&gt;
| Policy-based network slicing for IoT security&lt;br /&gt;
|-&lt;br /&gt;
| Intelligent fronthaul management and orchestration&lt;br /&gt;
|-&lt;br /&gt;
| rowspan=&amp;quot;3&amp;quot; style=&amp;quot;font-weight:bold;&amp;quot; | Service Orchestration and Management&lt;br /&gt;
| Context aware VoLTE service experience optimization&lt;br /&gt;
|-&lt;br /&gt;
| Intelligent network slicing management&lt;br /&gt;
|-&lt;br /&gt;
| Intelligent carrier-managed SD-WAN&lt;br /&gt;
|-&lt;br /&gt;
| rowspan=&amp;quot;2&amp;quot; style=&amp;quot;font-weight:bold;&amp;quot; | Network Assurance&lt;br /&gt;
| Network fault identification and prediction&lt;br /&gt;
|-&lt;br /&gt;
| Assurance of service requirements&lt;br /&gt;
|-&lt;br /&gt;
| rowspan=&amp;quot;3&amp;quot; style=&amp;quot;font-weight:bold;&amp;quot; | Infrastructure Management&lt;br /&gt;
| Policy-driven IDC traffic steering&lt;br /&gt;
|-&lt;br /&gt;
| Handling of peak planned occurrences&lt;br /&gt;
|-&lt;br /&gt;
| Energy optimization using AI&lt;br /&gt;
|-&lt;br /&gt;
| rowspan=&amp;quot;14&amp;quot; style=&amp;quot;font-weight:bold;&amp;quot; | Requirement&lt;br /&gt;
| rowspan=&amp;quot;6&amp;quot; style=&amp;quot;font-weight:bold;&amp;quot; | Service and network requirements&lt;br /&gt;
| General requirements&lt;br /&gt;
|-&lt;br /&gt;
| Service orchestration and management&lt;br /&gt;
|-&lt;br /&gt;
| Network planning and deployment&lt;br /&gt;
|-&lt;br /&gt;
| Network optimization&lt;br /&gt;
|-&lt;br /&gt;
| Resilience and reliability&lt;br /&gt;
|-&lt;br /&gt;
| Security and privacy&lt;br /&gt;
|-&lt;br /&gt;
| rowspan=&amp;quot;4&amp;quot; style=&amp;quot;font-weight:bold;&amp;quot; | Functional requirements&lt;br /&gt;
| Data Collection and Analysis&lt;br /&gt;
|-&lt;br /&gt;
| Policy Management&lt;br /&gt;
|-&lt;br /&gt;
| Data Learning&lt;br /&gt;
|-&lt;br /&gt;
| Interworking with Other Systems&lt;br /&gt;
|-&lt;br /&gt;
| rowspan=&amp;quot;4&amp;quot; style=&amp;quot;font-weight:bold;&amp;quot; | Non-functional requirements&lt;br /&gt;
| Performance requirements&lt;br /&gt;
|-&lt;br /&gt;
| Operational requirements&lt;br /&gt;
|-&lt;br /&gt;
| Regulatory requirements&lt;br /&gt;
|-&lt;br /&gt;
| Non-functional policy requirements&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
= Addressing a PoC Topic in a PoC Project =&lt;br /&gt;
PoC Teams specify the targeted PoC Topic(s) in their  PoC Proposal, and commit to provide the expected input or feedback in the requested format (template, if applicable) in a timely manner.&lt;br /&gt;
&lt;br /&gt;
= Feeding back the results = &lt;br /&gt;
As soon as experimental results relevant for a given ENI PoC Topic are available (no need to wait for the PoC Project to be completed), the PoC Team creates a contribution and informs the ISG ENI by email (if the PoC Topic had a specific template for feedback contributions, it should be used). PoC Teams are also encouraged to contribute additional results and lessons learned during the PoC Project to the ISG ENI.&lt;/div&gt;</summary>
		<author><name>Korycinska</name></author>
	</entry>
</feed>